The project faced several complex and interrelated challenges. First of all, the aim of the project was to improve energy efficiency in a listed and monumental building, where every change requires the utmost care and respect for the original structures. At the same time, it was necessary to implement advanced thermo-hygrometric control to ensure the proper conservation of the numerous works of art housed inside the building.
Climate comfort also had to be ensured uniformly for visitors, employees and the spaces used for events and exhibitions. Finally, the technological systems installed had to integrate discreetly and functionally into the complex existing architecture, without altering its aesthetics or integrity.


