The system is based on:
- 2 VRF Heat Recovery MV6R-XMI systems (size 400 and 450) to supply the indoor VRF cassette-type and ducted units serving the office area rehabilitation gym and physiotherapy room
- 2 VRF HYDROMODULE for the production of domestic hot water throughout the building
- 1 AQX1 central air handling unit for air conditioning and air renewal in the video area
- 1 VRF MV6i-XMi 500T VRF system combined with two AQX6 central air handling units for air conditioning and primary air treatment in the changing room area
- 1 VRF MV6i-XMi 400T VRF system combined with a SAHU06 central air handling unit for air-conditioning the gym area
- 1 autonomous heat pump system for air renewal and purification Zephir3 equipped with electronic filters and active thermodynamic recovery for primary air treatment in the gym area
- 1 MV6i-XMi 560T VRF system combined with a central air handling unit for air conditioning and primary air treatment of the wellness area
- 1 CLIVET MM2 Y 35M Cristallo Monosplit system for cooling a technical room
A series of advanced controls manage the entire system, guaranteeing the comfort and well-being of athletes and staff, as well as considerable energy savings and interfacing with Milanello's central BMS.
The results
The result is a gymnasium that guarantees the ideal temperature and clean air in every area so that athletes can work in an environment that allows them to reach their full potential for a team that is always striving for excellence and improving its performance.
The protagonists:
Investor: Milan Real Estate SPA
Building project: MDB Architettura - Milan
Plant designer: Studio Impianti Tecnologici Rossi Per. Ind.Tranquillo - Casnigo (BG)