Application: San Pier Damiano Hospital
Air conditioning for hospitals

Breadcrumbs
AIR CONDITIONING FOR HOSPITALS
San Pier Damiano Hospital, Faenza, Ravenna, Italy
Specialised hospital with 148 beds
Enhanced Hydronic System
Year 2010
The adoption of the enhanced hydronic system, ensuring the environmental comfort and air quality, fully complies with the GVM Care & Research Ethics Code, which engages its operators in favor of the total well-being of each patient. Also from the economic point of view, this system has satisfied the Customer requirements, both for the initial financial investment and above all for the management costs, which are fundamental in the budget of a 24-hour operating structure.
“The solutions adopted, namely the high dehumidifying capacity and electronic filtering, have noticeably increased the quality of air in the wards, as noticed by users and operators.
The system proved to be able to work non-stop also in very severe weather conditions with outdoor temperatures between -15°C e +40°C.
The gradual execution of the works in one area at a time avoided disruption to healthcare services. The second primary air system was purchased and installed a year after the first one, which also spread the investment. The air flow rates were set in relation to specific needs on a case-by-case basis, until the current final set-up was identified.
The choice of stand-alone primary air systems allowed the client to keep existing cooling and heating fluids and reduce their use to a minimum. Therefore, it was not necessary to invest in a new heating and cooling unit.
Works on the roof were minimal too, thanks to the system's very compact design and the presence of just two pipes for the fluids.
The high energy efficiency and positive experience led GVM Care & Research to also choose Clivet to increase the efficiency of the chilling system, where one of the existing chilling units was replaced with a SPINchiller2 with modular Scroll technology with a capacity of over 500 kW.”
“Comfort and optimization of installation time without interruption of health services.”
GVM Care & Research, the user
















The Enhanced Hydronic System is the industrialized solution suitable for hospital waiting rooms and inpatient wards.
It's a modular solution with with fan coils or chilled beams.
The advantages of the Enhanced Hydronic System
- Overall energy saving over 30% in most locations in year round operation.
- Minimal carbon footprint: double-digit CO2 reduction
- Up to 42% saving on energy cost
- Savings up to 50% in space in comparison to traditional Primary Air AHU’s solutions.

Other Clivet solutions for hospitals
VRF
Inpatient wards, waiting rooms, outpatient departments and common areas are air-conditioned by VRF direct expansion systems, which heat, cool and produce domestic hot water.
The air renewal and purification can be assigned to:
- ZEPHIR3, the complete and autonomous system for handling primary air with active thermodynamic recovery and electronic filtration
- AQX air handling units, which ensure proper air distribution in the environment, purify the air by filtration, cool or heat as needed, manage the humidity where necessary, ensure the necessary air renewal.

Nursing home Villa Fiorita
Nursing home Villa Fiorita
Hydronic system
Year 2020

LA CASA DI FAUSTA
Give hospitality to children admitted to paediatric oncohaematology and their families.
Hydronic system + ELFOSystem
Year 2015

SSK HOSPITAL
State hospital
Hydronic System

KONYA NUMUNE HOSPITAL
State hospital 500 beds
Hydronic System

OSPEDALE RICERCA UNIVERSITA' KOCAELI
Kocaeli University Research and Application Hospital
Hydronic System

ADATIP ISTANBUL PRIVATE HOSPITAL
Private hospital
Hydronic System

OSPEDALE CIVICO PALERMO
Split System
Year 2018

CENTRO IPERBARICO RAVENNA
Private health structure of excellence
Hydronic System
Year 2019

CERVELLO HOSPITAL
Palermo, Italy
Department of Hematology1, Temporary First Aid COVID-19
Hydronic system - SPINChiller3 MF
Year 2020

FRATTAMAGGIORE HOSPITAL
Naples, Italy
First aid and intensive care unit
VRF system - MV6
Year 2020

CANADIAN MEDICAL CENTER
Hospital Santa Ana - Private Clinic

OSPEDALE PUGLIESE CIACCIO

S.CROCE AND CARLE HOSPITAL
Hydronic System

SAN PIER DAMIANO HOSPITAL

AL ZAHRA HOSPITAL
Dubai - United Emirates
Hydronic System